top of page

Gortemoller Engineering, Inc. served as the Prime Design Consultant providing engineering design services for the 3.43-mile sediment reduction project for Sweetwater Branch Road. This project included paving Sweetwater Branch Road, an unimproved roadway, with open grade asphalt. The project included roadside shoulders and swales for the conveyance of stormwater runoff as well as drainage improvements to maintain existing drainage including cross drains and storm drains.  

SERVICES PROVIDED: 

Minor Highway Design

Sediment Reduction 

Signing and Pavement Marking Design

Drainage Design 

CLIENT: 

Bay County 

LOCATION: 

Bay County, Florida

CONSTRUCTION COST:

$3,887,943

SWEETWATER BRANCH ROAD
SEDIMENT REDUCTION

 

20240104_163413.jpg
20240104_163451.jpg
20240104_164009.jpg
bottom of page